Q1.
One of the places on the North–South Corridor was 1,855 km from Srinagar and 1,862 km from Kanniyakumari. What was the total length of the North–South Corridor in 2019?
Answer
The North–South Corridor was 3,717 km long.
The place marked A on the map splits the whole road into two parts. One part reaches back to Srinagar, the other goes on to Kanniyakumari. Put the two parts together to get the whole road.
Total length = 1,855 km + 1,862 km
- Ones: 5 + 2 = 7. Write 7.
- Tens: 5 + 6 = 11. Write 1 and carry 1 hundred.
- Hundreds: 8 + 8 = 16, and the carried 1 makes 17. Write 7 and carry 1 thousand.
- Thousands: 1 + 1 = 2, and the carried 1 makes 3. Write 3.
| Th | H | T | O |
|---|---|---|---|
| 1 (carried) | 1 (carried) | ||
| 1 | 8 | 5 | 5 |
| + 1 | 8 | 6 | 2 |
| 3 | 7 | 1 | 7 |
Total length of the North–South Corridor = 3,717 km
One thing to notice in the book: The map beside the paragraph prints 1885 km for the northern part, but the words in the paragraph say 1,855 km, and the worked sum on page 47 also uses 1,855 km. Use 1,855 km — the map label is a printing slip.